When performing a powered leakage test on the PT250
With the power lead connected you have to make sure you select the “LKGE” button when ready to perform the “ILEAK” test – if not, the instrument will display “STOP” and not complete the test.
Note if the unit is not plugged into the mains it will automatically perform the battery powered Substitute Leakage test at 40Vac.
Sign up to our Newsletter.
Stay up to date with the latest industry and product news, as well as our free educational content such as webinars and our expert guides.
Close