What does the “STOP” message indicate on the PrimeTest 250?

When performing a powered leakage test on the PT250

With the power lead connected you have to make sure you select the “LKGE” button when ready to perform the “ILEAK” test – if not, the instrument will display “STOP” and not complete the test.

Note if the unit is not plugged into the mains it will automatically perform the battery powered Substitute Leakage test at 40Vac.

Don't know what you're looking for?
The Seaward PAT tester selector will guide you to your ideal tester, based on some simple questions.
Do you still need help?
Download our free guide to PAT Testing.

Still need help? Ask us.


Stay in the know
Sign up to our mailing list today to stay up to date with the latest industry news and information from Seaward.

I'd like to talk to a sales advisor

Our team of sales advisors are on hand to help you with any queries you have about our products.